Work on the arena within the walled garden has gone well during March and April because of the long dry spell. Russell has completed the corner of the wall where there is to be a door with steps on the outside which lead down to the stream. Russell is now working on the last corner on the inside of the wall. We can then start the ground work for the outdoor menage. Half of the drains have been laid so hopefully if we have any major downpours the inside of the walled should now no longer resemble a pond! There will not be enough stone from the demolition of the original wall to complete the ourside, but fortunately we have located a fallen down stone building at a local farm and the farmer has agreed to sell us some stone.
Tuesday, March 24, 2009
New Garage

Saturday, February 28, 2009
New Roof for the Goats and Ducks

At the back of the building which used to be an old pig sty there is a small door which we are going to open up door so that the goats can go out and then cross over the stream. We are going to put a railway sleeper over the stream so the goats can cross over into a small paddock.
Sunday, February 8, 2009
A Snowy Start to the Year



Friday, November 21, 2008
The Wall starts to go up

We are now half way through November and he has almost completed the first part of the stone walling which is inside the future outdoor school. Half of the drainage in the outdoor school has been laid, but this cannot be completed until Russell has finished working on the inside of the wall which will probably be after Christmas.
We are planning to have a door installed in the corner of the school with steps on the outside which will take you down to the stream. The photo shows Russell working on part of the wall beside the opening for the future door which shows the upright to the left of the photo.