Walled Garden Finished Inside
The walled garden has been completed in stone on the inside, which now leaves Russell to spend the summer working on the outside of the wall. He is working on the stream side first as this is the most difficult as we have had several weeks with dry weather and the ground is firm enough for him to bring his tractor and trailer to the edge of the stream. He is working just behind the door in the corner of the new wall which you can see in the photo. The drains have been laid and the area has been covered with small stones ready for the membrane which will be laid all over the riding arena before the sand. The surface material has been ordered and is due to be delivered at the end of June. We have bought our surface from Martin Collins who is well known for his products and we have chosen Activ-Track which is a sand and wax mix.