Last summer the back section of the roof on the dog kennel and goat and duck house had its slates replaced and we have now finally started on the front half. Several slates had slipped down after the snow and rain was starting to pour in. New felt and battons have been put on the roof and most of the old slates are being put back and hopefully it will be complete before it starts raining.
At the back of the building which used to be an old pig sty there is a small door which we are going to open up door so that the goats can go out and then cross over the stream. We are going to put a railway sleeper over the stream so the goats can cross over into a small paddock.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment