Friday, December 14, 2012
Medieval Barn Restoration
As well as working on the inside of the Medieval Barn we also have quite a lot of work to do outside. The window to the left in the photograph will be filled in with cob bricks and the door to the right is to be replaced and will match the new door on the left. The shrubs have been grubbed out in front of the barn ready for repairs to the rendering and then once completed the outside with be painted with limewash,. The stonework over the doorway will be covered with lime rendering and then the rose which is currently tied up will be trained to go over the doorway.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment