We have now got the go ahead from Exmoor National Park to start to take the wall down and rebuild it 10 metres further back so that the riding arena can be the full 40 x 20 metres with a grass surround so that we don't have to ride right up to the wall. We have found a local stone wall builder, Russell Liversidge from Timberscombe who will be starting on the project in two weeks time. The foundations for the replacement wall need to be built first before Russell can erect the scaffolding to start rebuilding the wall. We are planning for block work to go up in the centre of the wall and the stone will be faced on the outside. The plan is to faceup the wall on the inside of the arena so that the riding arena can be built and then Russell will come back in 2009 to finish off the outside of the wall. The first phase of the project is likely take three months, which should take Russell up to Christmas. We just need the rain to stop and dry up so that we are not working in a muddy bog.