
Friday, March 7, 2008
The Walled Garden
The picture shows the back of the medieval barn which is at one end of the walled garden. The previous owners used to keep pigs in the walled garden and a few old apples trees. We have pruned the ivy on the top of two of the walls before the birds start nesting as we are planning to construct an equine sand school within the walled garden. However we now have to wait for permission from the council before we can start building as they have to approve an archealogical survey within the walled garden. They will be looking for any artifacts as Burrow was built on a medieval settlement. There is evidence from a later date of old concrete circle which may have housed an engine that would have been driven by horsepower.
The Indian Runner Ducks
We have just collected two ducks and one drake from Jacquie at Brandel Rare Breed Poultry near Wellington in Somerset.The picture shows the ducks on their first day out after spending a week inside to get them used to their surroundings. Hopefully once they are more settled and less nervous we will be able to introduce them to the pond in the courtyard, but in the meantime they have to make do with a plastic bowl for washing!
Tuesday, February 19, 2008
The Barn is Finished
PFG has now completed the barn and all the tractors, horsebox and JCB are safely installed inside. The weather has been dry and cold recently which has meant that work outside the barn has started. Two new manholes for the water off the roof and the yard have been built and we are just waiting for the piles of earth to dry out a bit more before the Exmoor bank can be built and the driveway infront of the barn can be completed. A bit more tidying up to be done yet before the top surface on the road can be laid, but we are getting there!
Thursday, January 17, 2008
The Barn goes up

PFG Fabrication have started putting up the barn despite the wet and windy weather. They had to pump out water from the holes that had been dug for the steel uprights before they could start. The roof is now complete and the guttering has been added. The sides which will be wooden boarding will take longer to put on and once that is completed a concrete floor will be laid.
All the tractors and other equipment are currently outside getting very wet and hopefully we will soon be able to get them all inside.
Friday, January 4, 2008
Another New Roof!
The new slate roof on the Animal Annex is now complete and because it looks so good we have decided to replace the roof on the Pigmy goat house and the future duck house.Work has started on stripping off the old roof and replacing the timbers before we can re-slate.
In the centre of the photo is Derek's black cat DC who is helping supervise the work.
Saturday, December 15, 2007
Animal Annex New Roof
We have started reburbishing the old kennels which will be our 'Animal Annex' to go with the holiday cottage. Derek and Rob are renewing the slates on the back of the roof and then we will start on altering the inside.There will be a wash down tiled area for dogs that are muddy when they come back from their walks and lots of towels for a rub down. There will also be a big 'Tuffie' dog bed for them to lie on while they dry. We will be having some guinea pig/rabbit and hamster cages, so guests can also bring these pets on holiday.
Subscribe to:
Posts (Atom)